Biscayne-Everglades Greenway: route, history and status

A planned bike and walking loop between Everglades and Biscayne national parks has been in the works since 2006. Here is what has been built, how it is funded and where to check progress.

Published 4 min read 6 sources
Route-map illustration for Biscayne-Everglades Greenway: route, history and status

Historical note: This address was previously part of the website of Green Mobility Network, a Miami-area bicycle and pedestrian advocacy group that promoted this trail. This site is now an independent publication and is not affiliated with that group. You can view the archived original via the Internet Archive. This page is a new explainer written in 2026.

The Biscayne-Everglades Greenway is a planned shared-use trail in far south Miami-Dade County that would connect two national parks, Everglades and Biscayne, through the cities of Homestead and Florida City. It has been discussed for two decades, and parts of it are now built. This page explains what the greenway is, how it developed, and how to check its current status.

What the greenway is

The National Park Service describes the greenway as a multi-partner project to link two of South Florida’s national parks with a non-motorized, multi-use trail. The idea is to give residents of Homestead, Florida City and surrounding communities a safe route for walking and cycling, and to give park visitors a way to travel between the parks without a car.

Miami-Dade County’s preferred corridor map, dated March 2007, shows the concept: a route running from the Ernest F. Coe Visitor Center at Everglades National Park east through Florida City and Homestead, with urban, suburban and rural segments, and on to the Dante Fascell Visitor Center at Biscayne National Park. The map also shows proposed trailheads and connections to other South Dade trails, including the South Dade Trail along the busway.

History

The NPS notes that the first public workshop on the greenway was held in June 2006, and a second workshop and design charrette followed in March 2007, supported by a grant to the American Institute of Architects’ Miami chapter. Partners named at the time included Miami-Dade’s park department, the two national parks, the Florida Office of Greenways and Trails, the City of Homestead and the NPS Rivers, Trails and Conservation Assistance Program.

Local advocates kept the project in view over the following years. Archived pages of the former Green Mobility Network describe the group helping with trail signage along the route using grants from a national rail-trails nonprofit, and co-hosting annual group rides on the corridor, the last recorded in March 2020. Those details come from the group’s own archived website.

Construction and funding

Building the trail has depended heavily on state money. In December 2021, Miami’s Community Newspapers reported that construction had officially begun in Homestead, describing the full greenway as a 42-mile paved loop and the work as grant funded through a partnership between the City of Homestead and FDOT’s SUN Trail program.

The SUN Trail program is FDOT’s statewide fund for paved, separated trails that are part of the Florida Greenways and Trails System. Projects must be on the designated network to compete for funding. You can read more about how that program works in our companion explainer on Florida’s SUN Trail network.

Current status

The most recent planning document we found is the Miami-Dade TPO’s January 2025 South Dade Trail Corridor Connections Feasibility Study. It lists the Biscayne-Everglades Greenway among the state’s Land Trail Priorities in South Dade, a classification that is a prerequisite for SUN Trail funding. The study identifies two priority junctions where the greenway meets the South Dade Trail and the Krome Path: one in Florida City along West Palm Drive, and one in Homestead along Mowry Drive.

In other words, as of 2025 the greenway remained a partly built system whose remaining gaps and connections were still being planned. We could not find a single official 2026 figure for how many miles are open, so we do not give one. For the latest maps, check the Florida Greenways and Trails System plan and maps published by the state Office of Greenways and Trails, along with City of Homestead and Miami-Dade County project pages.

Riding in the area

South Dade is flat and scenic but exposed. Shade is limited, summer heat is intense, and afternoon storms are common for much of the year. Some planned segments follow canal levees or rural roads with fast traffic. Ride with plenty of water, sun protection and lights, and read our guide to cycling safely in Florida’s climate before a long day out. For a wider view of the county network, see Miami’s greenways and shared-use paths and our Miami and South Florida coverage.

Where to find official information

  • Florida Office of Greenways and Trails (FDEP): statewide priority trail maps and status maps.
  • FDOT SUN Trail program: funded projects and program guidance.
  • Miami-Dade TPO: South Dade trail studies and the regional bicycle-pedestrian plan.
  • City of Homestead and Miami-Dade Parks: local construction notices and trail maps.
  • Everglades and Biscayne national parks: park access, hours and fees.

Key takeaways

  • The greenway is a planned non-motorized trail linking Everglades and Biscayne national parks through Florida City and Homestead.
  • Public planning began with a 2006 workshop, and a county preferred corridor was mapped in 2007.
  • Construction in Homestead began in 2021 with FDOT SUN Trail funding; the full loop was described as about 42 miles.
  • As of the TPO’s 2025 study, it remained a state trail priority with key connections still being planned.

Questions readers ask

How long is the Biscayne-Everglades Greenway?

When the City of Homestead announced construction in December 2021, the full trail was described as a 42-mile paved loop. Built sections are much shorter, and the rest is still planned, so check local agencies for current open segments.

Can I ride from Everglades National Park to Biscayne National Park today?

Parts of the route can be ridden on existing roads, trails and canal paths, but the greenway is not yet a continuous, separated trail. Plan any ride with current maps and carry plenty of water.

Sources

  1. Major Anniversaries, Biscayne-Everglades Greenway, National Park Service, Everglades National Park.
  2. Biscayne-Everglades Greenway preferred corridor map (2008 update), Miami-Dade County Parks, Recreation and Open Spaces (2007).
  3. Construction begins on Biscayne-Everglades Greenway Trail, Miami's Community Newspapers (2021).
  4. South Dade Trail Corridor Connections Feasibility Study, Executive Summary, Miami-Dade TPO (2025).
  5. Shared-Use Nonmotorized (SUN) Trail Program, Florida Department of Transportation.
  6. Florida Greenways and Trails System Plan and Maps, Florida Department of Environmental Protection, Office of Greenways and Trails.