Understanding Miami's cycling infrastructure: built and planned

A plain guide to the agencies, plans and projects behind Miami's bike network, with completed work clearly separated from plans and promises.

Published 6 min read 10 sources
Paved Underline path with a mile marker running beneath the elevated Metrorail guideway toward downtown towers
The Underline beneath the Metrorail guideway in Miami, looking toward downtown. Photo: Dtobias, Wikimedia Commons, CC BY 4.0 (cropped and resized).

Miami’s bike network is a patchwork built by several agencies over four decades. Some of it is mature and heavily used. Much of it exists only in plans. Knowing who is responsible, and which projects are actually on the ground, helps riders choose routes and helps residents follow what local governments promise.

This guide separates completed work from planned work and anchors each status to an official source and year. Where we could not confirm a current status, we say so.

Who builds what

Several public bodies share responsibility for streets and trails in Miami-Dade:

  • Miami-Dade County. The Department of Transportation and Public Works (DTPW) runs transit and county roads, including the causeways, and leads The Underline. The Parks department manages county trails.
  • City of Miami and other municipalities. Cities control many local streets and adopt their own bike plans. Miami Beach, Coral Gables and others run separate programs.
  • Miami-Dade Transportation Planning Organization (TPO). The TPO coordinates long-range regional planning, including bicycle and pedestrian master plans.
  • Florida Department of Transportation (FDOT). FDOT owns state roads, including major arterials such as US 1.

Because ownership is split, a single corridor can change design at a city line or where a state road begins. That is one reason the network feels disconnected in places.

Completed versus planned at a glance

Project Status (source, year)
M-Path under Metrorail Built 1983; about nine miles (TPO study, 2007)
The Underline Phase 1, Brickell Opened February 26, 2021 (Miami-Dade County)
The Underline Phase 2, 2.14 miles Opened April 24, 2024 (Miami-Dade County)
The Underline Phase 3, 7.36 miles Expected completion 2026 (Miami-Dade County page, 2025)
South Dade protected lanes, SW 211 Street Completed 2020 (Miami-Dade County)
Downtown Miami Micromobility Network Under construction in 2021, with lanes scheduled for March 2022 (county fact sheet, 2021)
Rickenbacker Causeway Phase I safety changes Completed July 2022 (Miami-Dade County)
Venetian Causeway bridge replacement In design, public meeting March 2026 (county fact sheet, 2026)
Ludlam Trail, 5.6 miles Design phase; construction phased by funding (Miami-Dade County)
City of Miami Bike Master Plan update Adopted May 28, 2026 (FIU Caplin News, 2026)

The Underline and the M-Path

The M-Path came first. A 2007 Metrorail M-Path Master Plan prepared for the county’s planning organization describes it as a nine-mile paved multi-use path built in 1983 by Miami-Dade Transit as part of the original Metrorail construction. That study flagged problems still familiar to riders: missing links, worn pavement, poor visibility and difficult road crossings.

The Underline is the county’s answer to those problems. Miami-Dade County describes it as a 10-mile corridor from the Miami River to Dadeland South station, 70 to 170 feet wide and covering about 120 acres beneath and beside the Metrorail guideway. When complete, it will connect eight Metrorail stations.

  • Completed: Phase 1, the Brickell segment between the Miami River and SW 13th Street, opened on February 26, 2021. Phase 2, a 2.14-mile segment from SW 13th Street to SW 19th Avenue, opened on April 24, 2024.
  • Planned or in progress: Phase 3 is a 7.36-mile segment from SW 19th Avenue near Vizcaya station to Dadeland South. The county’s Phase 3 page says the construction contract was awarded on October 18, 2022, gives an estimated construction cost of $109 million, lists improvements to 25 intersections along US 1, and says the phase is expected to be completed in 2026.

The causeways

Rickenbacker Causeway. The Rickenbacker links the mainland to Virginia Key and Key Biscayne and is one of the county’s busiest cycling routes. After a fatal crash in May 2022, Mayor Daniella Levine Cava directed immediate safety measures, according to a June 2022 county memo. The county’s Rickenbacker page reports that Phase I was completed in July 2022, closing the main U-turn at the William M. Powell Bridge.

The same page lists further work, including a Phase II with completion expected by June 2023, a causeway master plan scheduled for early 2024, and a Bear Cut Bridge study with construction expected in 2027. The page shows no update date, so we cannot confirm which of those later milestones have been met.

Venetian Causeway. A February 2026 county fact sheet describes a planned replacement of deteriorated Venetian Causeway bridges between North Bayshore Drive and Purdy Avenue. The plan would raise bridges to mitigate sea-level rise and add wider sidewalks and new bicycle lanes. As of that fact sheet, the project was in the design phase, with a public meeting held in March 2026.

Downtown and neighborhood bike lanes

Downtown Miami Micromobility Network. A 2021 county fact sheet describes separated bicycle and scooter lanes built by DTPW with the City of Miami and the Downtown Development Authority. It listed new separated lanes on N Miami Avenue, NE 1st Avenue, N 5th Street and N 6th Street, scheduled for completion by March 2022, with NE 15th Street in design, and added separation devices on the Venetian Causeway. Funding came from county road impact fees, City of Miami micromobility fees and the DDA. The county’s current micromobility page calls this its first micromobility network.

South Dade. The same county page reports a completed 2020 project with protected bike lanes on SW 211 Street, including nearly 6,000 linear feet (about 1.8 km) of raised concrete separators.

Miami Beach. The Miami-Dade TPO’s 2017 Protected Bike Lanes Demonstration Plan reported that Miami Beach installed the county’s first protected bike lane on West Avenue in 2017, following locations identified in the city’s 2016 Bicycle and Pedestrian Master Plan. For the benefits of this kind of design, see the benefits of protected bicycle lanes.

Plans that shape what comes next

City of Miami Bike Master Plan. According to FIU Caplin News, the city approved its first Bicycle Master Plan in 2009, when it had about 17 miles of bikeways, and the City Commission adopted an updated plan on May 28, 2026. The update focuses on priority projects meant to close gaps, including the Miami River Greenway. Adoption sets priorities; funding and construction come later.

Countywide bicycle and pedestrian planning. The Miami-Dade TPO’s 2045 Bicycle and Pedestrian Master Plan, published in 2019, scores projects partly on how well they connect people to rapid transit corridors and stations. That first-mile and last-mile focus is why many proposed bike projects cluster around Metrorail and planned transit lines.

Ludlam Trail. The Ludlam Trail is a planned 5.6-mile shared-use path on a former railroad corridor between NW 7th Street and SW 80th Street, linking toward Dadeland North station. The county says its environmental study was completed in 2023, design is starting, and construction will be phased based on funding availability.

How to read project announcements

A few habits help separate progress from promises:

  • Look for the phase. Planning, design, construction and opening are different milestones. A groundbreaking is not an opening.
  • Check the date on the page. Many official pages carry no update date. If a page describes a 2023 deadline in the future tense, its status may be out of date.
  • Follow the money. Plans often depend on grants or future budgets. A funded construction contract is a stronger signal than an adopted plan.

For the advocacy history behind many of these projects, see the history of cycling advocacy in South Florida. Our Miami and South Florida hub collects the rest of our regional coverage.

Key takeaways

  • Miami’s bike network is shared among Miami-Dade County, the cities, the TPO and FDOT, which helps explain design gaps at boundaries.
  • The M-Path dates to 1983; The Underline’s first two phases opened in 2021 and 2024, and the county expects Phase 3 completion in 2026.
  • Rickenbacker safety changes were completed in 2022; the Venetian Causeway bridge replacement was in design as of 2026.
  • The City of Miami adopted an updated Bike Master Plan in May 2026, but adopted plans still need funding and construction.
  • When reading project news, check the phase, the page date and whether construction is funded.

Questions readers ask

Is The Underline finished?

Phases 1 and 2 opened in 2021 and 2024. Miami-Dade County's Phase 3 page says the final 7.36-mile segment to Dadeland South is expected to be completed in 2026, so check the county's project page for the latest opening status.

What is the difference between the M-Path and The Underline?

The M-Path is the original paved path under the Metrorail guideway, built in 1983 according to a 2007 county planning study. The Underline is the county's redevelopment of that corridor into a 10-mile linear park and trail with rebuilt paths, crossings and landscaping.

Who is responsible for bike lanes in Miami?

It depends on the road. Miami-Dade County, cities such as Miami and Miami Beach, and the Florida Department of Transportation each own and manage different streets, and the Miami-Dade TPO coordinates regional planning.

Sources

  1. The Underline, Miami-Dade County (2025).
  2. The Underline Phase 3, Miami-Dade County (2025).
  3. Metrorail M-Path Master Plan Executive Summary, Miami-Dade Metropolitan Planning Organization (2007).
  4. Protected Bike Lanes Demonstration Plan, Final Report, Miami-Dade TPO (2017).
  5. Downtown Miami Micromobility Network Fact Sheet, Miami-Dade County Department of Transportation and Public Works (2021).
  6. Micromobility Networks, Miami-Dade County (2025).
  7. Rickenbacker Causeway, Miami-Dade County Department of Transportation and Public Works (2025).
  8. Venetian Causeway Bridge Replacement Fact Sheet, Miami-Dade County Department of Transportation and Public Works (2026).
  9. Ludlam Trail, Miami-Dade County Parks, Recreation and Open Spaces (2025).
  10. Miami's new bike plan promises connections, and cyclists want proof, FIU Caplin News (2026).